Daniel Esquivel
ESPAI BARÇA
(the question)
How do you explain the biggest construction project in the club’s history to everyone it affects, from members and neighbours to partners and fans who’ll never set foot on site?
(the idea)
One door, many audiences. A site organised by who’s asking, built on the brand’s «+», designed so anyone can use it.
(services)
UX/UI · Web design · Information architecture · Accessibility · Motion
(client)
FC Barcelona · Espai Barça
(role)
Lead designer, web
(year)
2024
01 · MANY AUDIENCES, ONE SITE
A stadium rebuilt while the team plays elsewhere, plus a new arena, a training campus and a whole neighbourhood around it. Members want to know about their seats, neighbours about the works, partners about visibility, fans about the experience. The architecture starts from them: a user path per audience, with content ordered by what each one needs first.
02 · THE «+» AS A SYSTEM
The identity had a central «+» inside the crest. On screen it became the structure: it frames images, marks sections and sorts information. The system was documented for development: type scale, colour guidance, CTAs, icons, paddings, patterns and breakpoints. Built as tokens from the start, alongside the final designs, so the system can grow with the brand.
03 · FROM VIDEO GAME TO READING ROOM
The first sketch was a fully modelled 3D Espai Barça you could travel through, almost like a video game. Budget took the 3D. Then accessibility entered the brief, and I set the bar against Barcelona City Council’s guidelines: the animated transitions and the most editorial layouts went too. What stayed, on every page, was what matters to the people who actually need the information: contrast, hierarchy and type sizes built for reading. Simpler, on purpose.
04 · MOTION WHERE IT COUNTS
With animation stripped from the interface, motion moved to the moments that carry the story: a hero built from an image sequence that also works on mobile, and the film that launched the site.
05 · BUILT IN SPRINTS
Three sprints, desktop and mobile: About the project, the new experience, sustainability, news, partners, the spaces (Spotify Camp Nou, Palau Blaugrana, Estadi Johan Cruyff, Campus Barça), FAQs and a listening channel for members. Handed to development page by page, reviewed in the build.
(the result)
Phase one live in July 2024, phase two in September. World Brand Design Society, Commended Mention, Digital: Website (2025).


















